T1 4 port boost control solenoid, T1 mounting bracket, 3 brass barb fittings and 1 filter. Term with EV1 male connector for PNP.
Plumbing instructions:
Port A – goes to the top of the gates
Port B – goes to the bottom of the gates
Port In – pressure in from turbo
Port Ex – exhaust vent, leave as supplied
Reviews
There are no reviews yet.